Quality & documents
Engineer-verified. Documented. Every order.
Every order runs through the same six checks, and the document pack ships with the parts, so your QA team can accept the delivery the first time.
Six checks on every order
- Service conditions captured. Fluid, H2S and CO2, pressure (psi), temperature range (°F), static or dynamic, and decompression rate.
- Compound selected and justified. The quote states which compound and hardness we propose, and why.
- Gland checked. Squeeze, stretch, fill and extrusion gap against pressure; back-up rings added where needed.
- Supplier certificates checked. The manufacturer’s 3.1 certificate and test data are checked against the compound specification before shipment.
- Inspected before shipment. Hardness (Shore A), critical dimensions and visual condition, using a defined sampling plan.
- Document pack issued. Certificate of conformity, 3.1 certificate, inspection report and traceability record.
What is in the document pack
| Document | What it shows |
|---|---|
| Certificate of conformity | The parts match the order, the drawing and the compound specified |
| EN 10204 3.1 material certificate | Compound test results, certified by the manufacturer’s inspection department independent of production |
| Batch and cure-date record | Which batch your seals came from and when they were cured, for shelf-life tracking |
| Inspection report | Hardness, critical dimensions and visual condition, with the sampling plan used |
| Compound datasheet | Typical properties and temperature range of the supplied compound |
| RGD and sour-gas test reports (where specified) | Third-party qualification to NORSOK M-710 or ISO 23936-2 |
How we qualify manufacturing partners
- Factory audit covering mixing, molding, post-cure and the lab
- Named raw polymer and compound code on every purchase order
- Sample testing of each compound before first use
- Pre-shipment inspection on larger orders
- Two qualified sources per compound wherever possible
Storage and shelf life
Every bag is labelled with the batch number and cure date, so you can manage shelf life and storage to ISO 2230.
Store seals cool, dry and out of direct light, away from ozone sources such as electric motors.
See the paperwork before you order.
Request a sample document pack, or send your RFQ and receive it with the quote.